Inflating the culvert plug.
Putting the culvert plug in place.
Eric Shufelt (Barnstable Harbormaster Dept) leading the debrief on culvert plug deployment.
Inflated culvert plug. 24" plug was inflated enough to block a 36" culvert, although it might not hold under all conditions.
Yarmouth Natural Resources, Harbormaster, and Fire personnel unloading boom at Englewood.
Towing boom from Englewood for Lewis Bay Exclusion deployment at Sweetheart Creek.
Towing boom toward shoreline anchor point.
Setting first shoreline anchor point.
Setting apex anchor.
First leg of exclusion boom array.
Towing second leg of exclusion array.
Vessel-to-vessel communications, the old fashioned way.
Shoreline anchor point for second leg of exclusion array.
Connecting the two legs.
Adjusting the apex.
Final result.
Preparation for inner harbor diversion booming.
Barnstable spill response trailer.
Towing boom.
Setting diversion leg.
First set.
Adjusting the angle and tension on anchor line.
Successful deployment.